Home
About Us
Contact Details
Operating Areas
Commercial Team
Projects
City Centre / Retail
Commercial Offices
Education
Hospitals
Leisure
Residential / Hotels
Warehouse / Distribution
Partnering
Press
Press Page
Press Releases
Capabilities
Design
Manufacturing
Project Management
Policies
Health and Safety
Environmental
Quality
Links
08 September 2010
Latest News at AWS
'Atlas Ward credits Carbon Positive project in North Staffs'
G-Park Blue Planet Chatterley Valley will be a truly “Carbon Positive” development - the complex will have its own bio-mass power station, which will produce sufficient power and heat for the on-site buildings and a surplus that will provide enough energy to power up to 650 local homes . . .
'Atlas Ward builds the largest pre-let in South East'
The new warehouse and distribution complex, based at G-Park Sittingbourne, located close to the M2 in Kent, will be used by leading retailer Morrisons to service and supply its South East stores . . .
'Top of the Class for Atlas Ward'
Atlas Ward is responsible for the fabrication and erection of in excess of 1200 tonnes of structural steelwork for Anniesland College in Glasgow.
This also includes approximately 200 tonnes of Fabsec plated floor beams.
The overall construction value is £35 million and the scheme in its entirety is scheduled for completion in 2010 . . .
'Atlas Ward helps Tesco with its first purpose-built import centre in the UK'
Atlas Ward is currently working on a new project to build a 1.0m sq ft import storage facility in Teesport. The contract was awarded by main contractor Bowmer & Kirkland on behalf of UK retail giant Tesco . . .
:End
City Centre / Retail
:
Commercial Offices
:
Education
:
Hospitals
:
Leisure
:
Residential/Hotels
:
Warehouse/Distribution
Market Sector
Hospitals
Project Overview -
Wharfedale Hospital
This hospital project is a 3 storey structure in the shape of a ‘square doughnut’.
This pre-engineered building included approximately 200 tonnes of 18m long spanning beams together with the supply and fix of the metal floor decking.
Project Datasheet
Location :
Leeds
Main Contractor :
HBG Construction
Ultimate Client :
PFI
Footprint :
9,696 m2 (104,500 ft2)
Tonnage :
650
Scope of Works :
Steelwork and Decking
Showing projects
1 - 5
out of
5
total
Lymington New Forest Hospital
Princess Alexandra Hospital Extension
School of Nursing, Norwich
St. Margaret's Hospital
Wharfedale Hospital
> Severfield-Rowen Group Website